| Project Name | Year |
|---|---|
| B500 PIPING 6" Vent B500 to Blowdown Tank | 2015 |
| New 4500 CU Cooling Tower | 2014 |
| Metal Roof 300m beside Prod bldg | 2014 |
| New Waste Water Collection Tank | 2014 |
| Install ED2101/ED2201(Air Preheater) | 2014 |
| Replace Pipe Line RCW | 2014 |
| Bracing for P-BOX Buffer | 2014 |
| NPP Y13 Hazardous Waste Improvement | 2013 |
| Dust Proof Process Line | 2013 |
| Truck Parking Yard & Truck Traffic way | 2013 |
| Fabrication N2 Mobile Metering | 2013 |
| R96 Hazardous Waster Improvement | 2012 |
| New MMA Line to A226 | 2011 |
| Concrete Laydown Area | 2011 |
| Fabricate and install Roof | 2011 |
| Support for Line 2 | 2011 |
| Support T301 | 2011 |
| PVC Substation Phase 2 | 2011 |
| Loading Lamp | 2011 |
| Substaion Extension | 2011 |
| VCM Membrane Steel Structure | 2011 |
| VCM Compressor Foundation | 2011 |